Laserfiche WebLink
x <br /> CLIENT: <br /> VEEDER ROOT CARBON � ST POUSHER <br /> COMPUANCE <br /> THESE NOTES ARE APPLICABLE TO NEW AND RETROFIT INSTALLATIONS <br /> LOCATION OF VAPOR PROCESSING EQUIPMENT CA FIRE CODE: ADDITIONAL INSTALLATION NOTES: ADDITIONAL INSTALLATION NOTES AT DISPENSERS: fix. <br /> CFC 2010 §2206.7.9.2.2 LOCATION 1. ALL INSTALLATIONS OF VEEDER ROOT CARBON CANISTER VAPOR POLISHER 1. SOME DISPENSER NOZZLES HOLSTERS ARE NOT COMPATIBLE WITH THE <br /> INSTALLATIONS SHALL BE REVIEWED BY BP LOGISTICS FOR APPROVAL CURRENT VST DESIGN. CONSULT WITH BP PROJECT MANAGER FOR A LIST <br /> EQUIPMENT VAPOR-PROCESSING EQUIPMENT SHALL BE LOCATED AT OR ABOVE PRIOR TO SUBMITTALS TO AUTHORITIES HAVING JURISDICTION AND OF DISPENSERS THAT ARE NOT COMPATIBLE WITH THE DESIGN AND DO NOT <br /> GRADE. SOURCES OF IGNITION SHALL BE LOCATED NOT LESS THAN 50 FEET RE-REVIEWED BY BP LOGISTICS AFTER PERMIT APPROVALS ARE OBTAINED. INSTALL VST AT LOCATIONS WHERE THESE DISPENSERS EXIST. <br /> (15240MM) FROM FUEL-TRANSFER AREAS AND NOT LESS THAN 18 INCHES ADDITIONALLY INDIVIDUAL SITE PLANS NEED TO BE REVIEWED BY THE ECS <br /> TO MAKE SURE THERE ARE NO SENSITIVE RECEPTORS WITHIN 1000 FEET 2. THE PRESSURE SENSOR LOCATED IN THE DISPENSER SUMP CLOSEST TO <br /> (457.2MM) ABOVE TANK FILL OPENINGS AND TOPS OF DISPENSER ISLANDS. OF THE EQUIPMENT LOCATION. <br /> THE TANK FARM SHALL BE PREFERABLY MOUNTED OUTSIDE THE DISPENSER VAPOR-PROCESSING UNITS SHALL BE LOCATED NOT LESS THAN 10 FEET 2. ON EXISTING FACILITIES CONTRACTOR TO PERFORM LIQUID AND VAPOR CONTAINMENT SUMP OR ABOVE THE HIGHEST PENETRATION FITTING. DURING ARCO <br /> (3048MM) FROM THE NEAREST BUILDING OR PROPERTY LINE OF A PROPERTY TIGHTNESS TEST ON VENT LINES PRIOR TO PROCEEDING WITH INSTALLATION CONTAINMENT SUMP CERTIFICATION TESTING CONTRACTOR TO REMOVE THE <br /> WHICH CAN BE BUILT UPON. OF THE VEEDER ROOT SYSTEM, REPORT TO BP PRODUCT MANAGER WITH PRESSURE SWITCH TO AVOID POSSIBLE WATER DAMAGE. IN, , CDT Mmm LLC <br /> EXCEPTION: WHERE THE REQUIRED DISTANCES TO BUILDINGS, PROPERTY RESULTS. 3. THE PRESSURE SENSOR MUST BE INSTALLED IN THE VERTICAL POSITION, <br /> LINES OR FUEL-TRANSFER AREAS CANNOT BE OBTAINED, MEANS SHALL BE SENSING PORT POINTING DOWN, AND WHEN REQUIRED BY AUTHORITY HAVING <br /> PROVIDED TO PROTECT EQUIPMENT AGAINST FIRE EXPOSURE. ACCEPTABLE 3. THE VENT DISCHARGE SHALL BE LOCATED AND DIRECTED SO THAT VAPORS <br /> MEANS INCLUDE: WILL DISPERSE. VAPORS SHALL BE DIRECTED UPWARD AND HORIZONTALLY JURISDICTION, THE CONNECTION TO THE VAPOR LINE MUST BE BELOW THE <br /> 1. APPROVED PROTECTIVE ENCLOSURES, WHICH EXTEND AT LEASE 18 AWAY FROM ADJACENT WALLS. VENT OUTLETS SHALL BE LOCATED SO AS SHEAR VALVE <br /> INCHES (457.2MM) ABOVE THE EQUIPMENT, CONSTRUCTED OF FIRE-RESISTANT NOT TO BE TRAPPED BY EAVES OR OTHER OBSTRUCTIONS AND SHALL BE <br /> OR NON-COMBUSTIBLE MATERIALS OR AT LEAST 5 FEET FROM BUILDING OPENINGS. DISCHARGE SHALL NOT BE 4. THE 3-WAY VALVE TEST PORT ON THE PRESSURE SENSOR IN THE <br /> 2. FIRE PROTECTION USING AN APPROVED WATER-SPRAY SYSTEM. LESS THAN 12' FROM FINISH GRADE. VENTS SHALL BE INSTALLED IN DISPENSER CLOSEST TO THE TANK FARM SHALL BE "CAR SEALED" WITH <br /> LABELS INDICATING CORRECT OPERATING POSITION. VALVE TO REMAIN <br /> ACCORDANCE WITH NFPA 30 (2012). CLOSED FOR NORMAL OPERATION TO AVOID FALSE PRESSURE READING BY <br /> VAPOR-PROCESSING EQUIPMENT SHALL BE LOCATED A MINIMUM OF 20 FEET THE ISD SOFTWARE. <br /> (6096MM) FROM DISPENSING DEVICES. PROCESSING EQUIPMENT SHALL BE 4. VENT RISERS SHOULD STAND NO LESS THAN 3' FROM THE OUTSIDE OF <br /> PROTECTED AGAINST PHYSICAL DAMAGE BY GUARDRAILS, CURBS, PROTECTIVE CURB.. 5. THE DISPENSERS MUST BE A BALANCE TYPE DISPENSER. <br /> ENCLOSURES OR FENCING. WHEN APPROVED PROTECTIVE ENCLOSURES ARE <br /> USED, APPROVED MEANS SHALL BE PROVIDED TO VENTILATE THE VOLUME5. THE CONTRACTOR IS RESPONSIBLE FOR SHORING AND THE PROTECTION IN 6. THE DISPENSERS MUST BE CARR APPROVED UNIHOSE TYPES UNLESS 4 X01 <br /> WITHIN THE ENCLOSURE TO PREVENT POCKETING OF FLAMMABLE VAPORS. � <br /> PLACE OF EXISTING FACILITIES. <br /> PERMITTED BY AUTHORITY HAVING JURISDICTION. <br /> IF A DOWNSLOPE EXISTS TOWARD THE LOCATION OF THE VAPOR-PROCESSING 6. MAINTAIN 5 FEET CLEAR AROUND CARBON CANISTER VAPOR POLISHER 7. THERE SHALL BE NO FLOW LIMITERS ALLOWED FOR THE VST SYSTEM. <br /> UNIT FROM A FUEL-TRANSFER AREA, THE CHIEF IS AUTHORIZED TO REQUIRE FOOTPRINT TO GRADE. 18215 72ND AVENUE SOUTH <br /> ADDITIONAL SEPARATION BY DISTANCE AND HEIGHT. 8. FOLLOW PEI RP-400 FOR ELECTRICAL CONTINUITY OF HANGING HARDWARE KENT, WA 98032 <br /> 7. BALL FLOAT VALVES ARE CURRENTLY INSTALLED AS BP STANDARD (425)251-6222 <br /> CFC 2010 §2206.7.9.2.3 INSTALLATION PRACTICE FOR PROTECTION OF WETTING OF THE VENT AND STAGE 11 VAPOR 9. THE VST HANGING HARDWARE HAS THE OPTION OF LONGER HOSE LENGTHS. (425)251-8782 FAX <br /> VAPOR-PROCESSING UNITS SHALL BE SECURELY MOUNTED ON CONCRETE, PIPING. CONTRACTOR TO CONFIRM THE EXISTING INSTALLATION AND MAXIMUM HOSE LENGTH WHEN CONNECTED IS LIMITED TO 15°-0" CONSULT <br /> MASONRY OR STRUCTURAL STEEL SUPPORTS ON CONCRETE OR OTHER REPLACE ALL BALL FLOAT VALVES AT EXISTING FACILITIES. WITH DISPENSER MANUFACTURER FOR EXTENDED HOSE REACH DESIGN CIVIL ENGINEERING, LAND PLANNING, <br /> NON-COMBUSTIBLE FOUNDATIONS. OPTION. SURVEYING, ENVIRONMENTAL SERVICES <br /> 8. CONTRACTOR SHALL CONFIRM AND LABEL ALL VENT STACKS WITH CORRECT <br /> NOTE: BP DOES NOT PERMIT THE VAPOR-PROCESSING EQUIPMENT TO BE PRODUCT VENT TIE IN TO AVOID PRODUCT CONTAMINATION AND IMPROPER NO. DATE REMSION DESCRIPTION <br /> INSTALLED ON ROOFS OF BUILDINGS OR CANOPY STRUCTURES. SEE ALTERNATE PROCESSOR TIE-IN. PROVIDE CONFIRMATION ON PIPE AND TANK CHECKLIST TESTING NOTES: <br /> MOUNTING DETAILS FOR EXISTING SITES WHERE VENT RISERS AR MOUNTED AT (LABEL MAKER OK). "DO NO INSTALL ON DIESEL" I <br /> ROOFS. PER CARB E.O. VR-204 ALL EXISTING SINGLE WALL VENT AND VAPOR PIPING a <br /> 9. THERE SHALL BE NO POCKETS OR LIQUID TRAPS IN ANY OF THE INSTALLATIONS AND NEW DOUBLE WALL VENT AND VAPOR INSTALLATIONS SHALL <br /> EXISTING CONDITIONS: CONNECTED PIPING FROM THE VEEDER ROOT CARBON CANISTER VAPOR HAVE THE FOLLOWING TESTS TO BE COMPLETED WITHIN 60 DAYS AFTER 3 <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXISTING POLISHER TO THE VENT STACK TIE-IN POINT. START-UP AND AT LEAST ONCE IN EACH 12 MONTH PERIOD USING THE <br /> CONTROLLING SITE CONDITIONS AND FOR COMPLIANCE WITH LOCAL ORDINANCES FOLLOWING TEST PROCEDURES. <br /> AND CURRENT CALIFORNIA BUILDING CODES. 10. THE VENT STACK RACK AND RISERS SHALL BE GROUNDED. TIE THE <br /> GROUND WIRE FROM THE VENT STACKS TO THE UST SYSTEM GROUND. TP-201.3 DETERMINATION OF 2-INCH WC STATIC PRESSURE <br /> APPLICABLE CODES: PERFORMANCE OF VAPOR RECOVERY SYSTEMS OF DISPENSING FACILITIES O <br /> ALL WORK SHALL BE IN STRICT ACCORDANCE WITH THE LATEST EDITION OF 11. PRIOR TO PERFORMING MAINTENANCE, TEST PORT VALVE MUST BE VENTED (March 17, 1999); 0 <br /> THE CALIFORNIA BUILDING CODE AND REFERENCED STANDARDS. TO ATMOSPHERE. <br /> PLANS AND PERMITS: TP-201.4 DYNAMIC BACK PRESSURE (July 3, 2002) IN ACCORDANCE a 0 <br /> THE CONTRACTOR SHALL OBTAIN ALL NECESSARY ENCROACHMENT PERMITS AND 12. VEEDER ROOT SYSTEM TO BE LEAK-TESTED PRIOR TO START-UP TO AVOID WITH THE CONDITION LISTED IN ITEM 1 OF THE VAPOR COLLECTION <br /> SHALL POSSESS APPROVED PLANS PRIOR TO BEGINNING OF CONSTRUCTION. LEAKAGE TO ATMOSPHERE. SECTION OF EXHIBIT 2 OF THE VR-204 EXECUTIVE ORDER; IN ADDITION <br /> BP PROCEDURES REQUIRE THE EXECUTION OF METHODOLOGY 6 Qo <br /> UTILITY LOCATIONS: 13. ANY SPENT CARBON FROM CANISTER SHALL BE TREATED AS HAZARDOUS 91 <br /> THE CONTRACTOR WILL BE REQUIRED TO NOTIFY MEMBERS OF UNDERGROUND WASTE AND DISPOSED OF PROPERLY EXHIBIT 4 OF THE VR-204 EXECUTIVE ORDER, REQUIRED ITEMS IN <br /> SERVICE ALTER U.S.A. 48 HOURS IN ADVANCE OF PERFORMING EXCAVATION CONDUCTING TP-201.3; 92 <br /> ( ) 14. INSPECT FOR VEEDER ROOT CARBON CANISTER VAPOR POLISHER FOR SEAL <br /> WORK BY CALLING THE TOLL-FREE NUMBER (800)-227-2600. EXCAVATION DAMAGE PRIOR TO START UP OR RE-COMMISIONING AFTER SERVICE. EXHIBIT 5 OF THE VR-204 EXECUTIVE ORDER, LIQUID REMOVAL TEST -� <br /> FOR THE PURPOSE OF THIS REQUIREMENT, IS DEFINED AS BEING 18" OR PROCEDURE; FESS/® <br /> MORE IN DEPTH BELOW THE EXISTING SURFACE. ELECTRICAL INSTALLATION NOTES: EXHIBIT 6 OF THE VR-204 E ��`���S M. Te® <br /> EXECUTIVE ORDER, HYDROCARBON SENSOR �� �� <br /> 1. ALL ELECTRICAL INSTALLATIONS ARE TO BE PER NEC/CEC CODE FOR THE VERIFICATION TEST; <br /> AREA INSTALLED. INSTALLATION IN A CLASSIFIED AREA IS AN EXCEPTION EXHIBIT 8 OF THE VR-204 EXECUTIVE ORDER, VAPOR 5 <br /> TO THE NORMAL SITING AND SHALL REQUIRE FURTHER REVIEW OF BP PRESSURE SENSOR VERIFICATION TEST; <br /> PROJECT MANAGER. <br /> 2. ENSURE THE VEEDER ROOT CARBON CANISTER VAPOR POLISHER IS EXHIBIT 9 OF THE VR-204 EXECUTIVE ORDER, DETERMINATION OF VST <br /> BONDED AND GROUNDED TO THE SITE SYSTEM AND TO THE SITE TANK PROCESSOR ACTIVATION PRESSURE; 4J, C I V 1 <br /> GROUNDING SYSTEM TO ELIMINATE THE POSSIBILITY OF ELECTRICAL AND EXHIBIT 11 OF THE VR-204 EXECUTIVE ORDER, OPERABILITY TEST 0 CAO'® <br /> DISCHARGE AS AN IGNITION SOURCE. PROCEDURE FOR THE VEEDER-ROOT ISD FLOW METER. <br /> 3. BONDING AND GROUNDING: BONDING AND GROUNDING GUIDELINES FOR SHORTER TIME PERIODS MAY BE SPECIFIED IN ACCORDANCE WITH LOCAL <br /> CONSTRUCTION REGARDING DISPENSING EQUIPMENT ARE TO BE IN PLACE DISTRICT REQUIREMENTS. NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST <br /> AND IN ACCORDANCE WITH PETROLEUM EQUIPMENT INSTITUTE (PEI). RESULTS, SHALL BE DONE IN ACCORDANCE WITH LOCAL DISTRICT <br /> REQUIREMENTS AND PURSUANT TO POLICIES ESTABLISHED BY THAT DISTRICT. <br /> ALTERNATIVE TEST PROCEDURES, INCLUDING MOST RECENT VERSIONS OF THE <br /> TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY THE ARB <br /> EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, TO YIELD <br /> EQUIVALENT RESULTS. IT IS FURTHER ORDERED THAT THE FOLLOWING <br /> REQUIREMENTS ARE MADE A CONDITION OF CERTIFICATION. THE OWNER OR <br /> OPERATOR OF THE VST PHASE Il EVR SYSTEM INCLUDING VEEDER-ROOT ISD <br /> SHALL CONDUCT, AND PASS, THE FOLLOWING TESTS NO LATER THAN 60 DAYS DEVELOPMENT INFORMATION: <br /> AFTER STARTUP USING THE FOLLOWING TEST PROCEDURE: EXHIBIT 10, NOZZLE ARCO HT <br /> BAG TEST PROCEDURE. NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST <br /> RESULTS, SHALL BE DONE IN ACCORDANCE WITH LOCAL DISTRICT 3= �� <br /> REQUIREMENTS AND PURSUANT TO THE POLICIES ESTABLISHED BY THAT <br /> DISTRICT. ALTERNATIVE TEST PROCEDURES, INCLUDING MOST RECENT VERSIONS FUEL CANOPY <br /> OF THE TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY v'il ro MPD9s <br /> THE ARB EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, <br /> TO YIELD EQUIVALENT <br /> RESULTS. <br /> SITE ADDRESS: <br /> © <br /> KMv <br /> MCALCIA CA <br /> FA(M I Y 0 TBD <br /> DESIGNED BY: ALLIANCE ZM: <br /> AL <br /> CHECKED BY: OV BP REP?1: <br /> DRAWN BY: ALLIANCE PM: <br /> AL <br /> VERSION: V-12.0 PROJECT NO: <br /> 12/14/205 17223 <br /> DRAWING TITLE: <br /> VEEDER-ROOT <br /> CARBON CANISTER VAPOR POLISHER <br /> COMPLIANCE AND INSTALLATION NOTES <br /> (CALIFORNIA®DLV) <br /> SHEET NO: <br /> io , ® r <br />