Laserfiche WebLink
JONES COVEY GROUP, INC. <br /> wMPLETE FUEL SYSTEM Cbiv�, I iwCTION Ft MAINTENANCE SERVICES <br /> June 23, 2021 <br /> MG2 <br /> 1101 Second Avenue,Suite 100 <br /> Seattle,WA 98101 <br /> Attn: Kristopher Artz <br /> RE:Costco#658,Tracy, CA Expansion Bid <br /> MG2#:00-3920-10 <br /> WORK TO BE PERFORMED: <br /> Thank you for the opportunity to provide this proposal. Jones Covey Group, Inc. agrees to furnish labor, equipment, materials, and <br /> perform the following work in accordance with the plans and specifications, industry standards,and in compliance with all federal, <br /> state, and local laws and regulations. <br /> PLANS AND SPECIFICATIONS <br /> Plans for bid use prepared by: <br /> • MG2:TSG-1,AG-0,AG-1,AG-2,AG-2.1,AG3 through AG-7, dated June 1, 2021. <br /> • Barghausen Consulting Engineers: C1.0,C2.0,C2.1, C3.0, C4.0, C5.0,C6.0, C7.0, C7.1, dated April 7, 2021. <br /> • Barghausen Consulting Engineers:T1-1,T2-1,T2-2,T3-1,T3-2,T3-3,T4-1,T4-2,T5-1,T5-2,T6-1,T6-2,T7-1, E1-0, E1-1, E2- <br /> 0, E2-1, E2-2, E3 through E12,dated April 12,2021. <br /> • Barghausen Consulting Engineers: L1, L2, dated April 7, 2021. <br /> • GMA Consulting Engineers:S-1.0,S-1.1,S-1.2,S-2.OA,S-2.013,S-2.1,S-2.2 dated May 27, 2021. <br /> Geotechnical Report, prepared by Kleinfelder,dated April 28, 2021. <br /> Project Manual, prepared by MG2,dated June 1, 2021. <br /> No Addenda listed <br /> CLARIFICATIONS <br /> • Based on the project phasing plan,we propose an eighty day,three-phase project with a forty-five-calendar day shutdown <br /> period. <br /> • Per conversations with APCO,Jones Covey assumes that a swing shift schedule will be implemented to minimize delays as <br /> night work is not feasible. <br /> • This budget includes costs for interlocking sheet pile shoring. It also includes miscellaneous dewatering in the amount of <br /> $15,000. No refresh rate of groundwater has been provided at time of green ink or at the time of bid. We strongly suggest <br /> a permeability study is conducted between bid and construction, providing recharge rates to include a calculation <br /> expressed as a gallons per minute/hour/day figure assuming a 16'x76'x19' interlocking sheet pile shored excavation. <br /> • Based on input from our shoring contractor,we have decided not to pursue a wet set tank installation. We believe the low <br /> permeability clay at the bottom of the excavation, in conjunction with interlocking sheets will provide a dry installation <br /> environment. <br /> 9595 LUCAS RANCH ROAD, RANCHO CUCAMONGA, CA 91730-CA LICENSE#804431 A, B, HAZ- LICENSED IN 41 STATES <br />