Laserfiche WebLink
,-;gLJG 27 "BE) 1458 209 465 ",31 P.4/6 <br /> Forward, Inc. <br /> Page 2 <br /> A survey plot must be submitted to the local zoning <br /> authority and the Regional Administrator within 60 calendar <br /> days of completion of closure as required by 40 CFR 265.116 <br /> and CCR Title 22 672.9. <br /> A notation must be placed on the deed to the facility <br /> property within 60 calendar days of certification of <br /> closure as required by 40 CFR 265.119 and CCR Title 22 <br /> 67220. <br /> The vegetative layer must be no less than l8 inches in <br /> thickness and must be planted with a grass mixture <br /> recommended by the Soil Conservation Service for the <br /> facility area. <br /> RL:sg <br /> RL.063 <br />