My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1984-1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1984-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:55 PM
Creation date
4/7/2023 1:44:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1984-1989
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
728
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 k KLEINFELDER <br /> File No.: 20-2578-01 <br /> October 17, 1989 <br /> Page 2 <br /> If in the future noticeable sloughing or cracks at the surface at the top of the slope <br /> begin to appear, we recommend that activities in the area of the slope be suspended <br /> until further analysis can be performed. <br /> We have also been asked to comment regarding WMU F which was constructed to <br /> receive landfill leachate. This is a temporary surface impoundment located west of <br /> the existing WMU E. Concern has been raised regarding the cracks along the top of <br /> interior and exterior sides of the levee. Based upon our observations, it appears as <br /> though this material is excess material that was not compacted at the time of <br /> construction. <br /> When constructing slopes it is common practice to overbuild the slopes in order to <br /> ensure compaction of the design section. Conversations with Gary Aksland, contractor <br /> for this project, has confirmed this observation. The levee was constructed according <br /> to the design section as called for ,in the plans and the overbuilt part was never <br /> neatly trimmed off. This excess material is what is beginning to slough off the sides. <br /> A probe inserted into the slough material revealed that firm material is approximately <br /> 12 to 18 inches below the surface. Since the material that is sloughing is excess <br /> uncompacted material, it is our opinion that the levee as constructed is stable and <br /> therefore no remedial action needs to be taken regarding the stability of this levee. <br /> We trust this letter present the requesting information and if you have any questions <br /> required further assistance please contact Qur office. <br /> H <br /> Respectfully Submitted, <br /> KLEINFELDER, INC. - - <br /> Patrick C. Dell C.E. <br /> Project Engineer <br /> PCD:lc <br /> MD77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.