Laserfiche WebLink
customer, and table is sprayed before and after each use. Reusable instruments <br /> are are-sterilized in a steam autoclave before use. They are sterilized again after <br /> each procedure by cleaning them with Cavi-cide and then properly packaged in <br /> sterilization peel-packs that contain sterilization indicators and then mass <br /> sterilized in a steam autoclave. As for ointments, they are applied with single-use <br /> q-tips to prevent cross contamination. <br /> F. Sharps Container: <br /> PPE is worn at all times which includes but is not limited to: single-use <br /> glo\,es. The sharps container is placed within an arms reach of the piercing/ tattoo <br /> bed in the procedure site. Once sharps containers are 3/4 full, they are placed in <br /> the takeaway recovery system which already has a prepaid shipping label and sent <br /> to SHARPS for proper disposal (mail back system). <br /> G. Sharps Disposal: <br /> Raz,Drs,/Needles: Razors/needles get discarded in sharps waste after every <br /> customer, razors/needles are single use. <br /> H. Mail Back System: <br /> We use the mail backs stem to proper) dispose of our sharps using a <br /> v v <br /> collection container (takeaway recovery system) <br /> Sharps Assure <br /> Street Address: 323A Fairfield Rd Unit 6 <br /> , State, ZIP: Freehold, NJ 00728 <br /> Phone: (732) 806-8590 <br /> I. Sterilization of Jewelry: <br /> All jewelry is sterilized using a steam autoclave prior to being used for <br /> piercing procedures. <br /> J. Sterilization of Equipment: <br /> After being put in sterilization peel-packs that contain sterilization indicators, <br /> the instruments are sterilized using a steam autoclave. <br /> K. Disinfection Products: <br /> We use Cavi-cide to disinfect. Per manufacturer instructions, minimum <br /> contact required for cleaning, pre-cleaning, and deodorizing is 3 minuts prior to <br /> wiping with a paper towel. Minimum contact for disinfecting for hard, non-porous <br /> surfaces is 6 minutes. <br /> L. Time and Temperature: <br /> Time: 30-45 min (depending on load size) <br />