My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Landfill WMU FU-23 <br />02778 5 HDPE GEOMEMBRANE <br />B. Delivery. 1. Deliver materials to the site only after the QA/QC CONSULTANT accepts required submittals. 2. Separate damaged rolls from undamaged rolls and store at locations designated by the OWNER until proper disposition of material is determined by OWNER. 3. QA/QC CONSULTANT will determine damage. 4. Deliver in rolls, do not fold. <br />C. Storage on Site: 1. Store geomembrane rolls in the space allocated by the OWNER. 2. Store geomembrane rolls to protect from puncture, dirt, grease, water, moisture, mud, mechanical abrasions, excessive heat or other damage. 3. Store geomembrane rolls on prepared surface (not on wooden pallets). 4. Stack geomembrane rolls no more than three rolls high. <br />D. Handling on Site: 1. Use appropriate handling equipment to load, move, and deploy geomembrane rolls. Appropriate handling equipment includes cloth chokers and spreader bars for loading, and spreader and roll bars for deployment. Dragging panels on ground surface will not be permitted. 2. Do not fold geomembrane material; folded material will be rejected. 3. The GEOSYNTHETICS CONTRACTOR is responsible for off-loading, storage, and transporting material from storage area to installation site. The EARTHWORK CONTRACTOR shall unload the materials if the GEOSYNTHETICS CONTRACTOR is not onsite. 4. The GEOSYNTHETICS CONTRACTOR shall be responsible for damage to HDPE geomembrane during delivery, even if the rolls are unloaded by the EARTHWORK CONTRACTOR. The QA/QC CONSULTANT will determine damage. 1.8 WARRANTY (MANUFACTURER) <br />A. Provide manufacturer's warranty for geomembrane material in compliance with provisions of the Conditions of the Contract. Provide a minimum 20-year pro rata warranty for the material against deterioration due to exposure to the elements, either exposed or buried. The warranty for material must cover costs of material replacement and installation; assuming the area is rendered in a clean, dry, unencumbered condition. In the event the area cannot be rendered as such, compensation for defective material will be provided to the OWNER on a pro rata basis for the estimated cost to the OWNER at that time of supplying and installing material to a clean, dry, and unencumbered condition by a third-party installer. <br />B. Installation: Provide an installation warranty for geomembrane material in compliance with the conditions of the Contract. Provide a minimum of 2-year non-pro rata warranty for the installation against defects. PART 2 PRODUCTS
The URL can be used to link to this page
Your browser does not support the video tag.