My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 18 <br />component has specific construction requirements that must be monitored. The following sections <br />list monitoring requirements for each type of earthwork. <br /> <br />3.4.1 Stockpiling and Soil Management <br /> <br />• Review Contractor's approved work plan submittal. Verifying stockpile locations, <br />stockpile dimensions, haul routes, material segregation procedures, and erosion, <br />sediment and drainage control measures. Determine and note corrective action items, if <br />applicable. <br /> <br />• During excavation, hauling, and stockpiling operations continually identify and verify <br />material classifications in accordance with ASTM D2478 and ASTM D2488 as <br />necessary to characterize material stockpile designations. Work closely with <br />Contractor's quality control personnel to classify materials using the rapid field tests <br />described in ASTM D2488. <br /> <br />• Verify that stockpiles are constructed with slopes no greater than two horizontal to one <br />vertical and that the top surface maintains a minimum 5 percent grade. Verify slopes and <br />grades using hand held levels and inclinometers, range poles, and measuring tapes. <br /> <br />3.4.2 Excavations <br /> <br />• Verify that construction staking is performed before work and that survey bench marks <br />with elevations are secured outside the work area. <br /> <br />• Verify that excavated materials are segregated into proper stockpiles. <br /> <br />• Coordinate with the Earthwork Contractor and Owner to perform excavation verification <br />surveys upon completion of excavating operations. Verify corrective action measures as <br />determined by verification surveys. Verification surveys will also be used to determined <br />limits of excavation for measurements and payment applications. Submit copy of <br />verification surveys to the Construction Manager. <br /> <br />3.4.3 General Earthfill <br /> <br />• Verify that construction staking is performed before work and that survey bench marks <br />with elevations are secured outside the work area. <br /> <br />• Perform visual and manual soil classifications (ASTM D2488) to verify that material <br />source is suitable for earthfills. Verify that the material is free of organic and oversized <br />materials. Perform classifications continually during excavation of borrow materials. <br /> <br />• Perform moisture-density relationship testing (ASTM D1557) to determine the <br />maximum dry density and optimum moisture content of earthfill materials. Perform tests <br />at testing frequencies specified in Section 3.2.2.
The URL can be used to link to this page
Your browser does not support the video tag.