My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 19 <br /> <br />• Verify that earthfill materials are placed and compacted in accordance with the <br />Specifications. If a sheepsfoot compactor is not used, verify that the top of each <br />compacted lift is scarified before placing the subsequent lift. <br /> <br />• Verify that general earthfill placed in anchor trenches and berms is appropriately <br />compacted. Hand held compaction equipment may be necessary to obtain adequate <br />compaction in certain locations. <br /> <br />• Perform nuclear density-moisture tests (ASTM D2922 and ASTM D3017) to verify that <br />each lift is compacted as required by the technical specifications. Perform tests at testing <br />frequencies specified in Section 3.2.2. <br /> <br />• Verify that soil materials that are too wet for proper compaction per Specifications are <br />properly aerated and processed to bring the moisture content of the material into the <br />acceptable range of the optimum moisture content. <br /> <br />• Verify that earthfill soils that are too dry for proper compaction per Specifications are <br />properly moisture conditioned and processed to bring the moisture content into the <br />acceptable range of the optimum moisture content. <br /> <br />• Verify that desiccated earthfills are properly repaired or removed before placing <br />subsequent lifts. <br /> <br />• Verify that final earthfill surfaces are free of ruts, gouges, and other features that might <br />contribute to erosion and sediment run-off. <br /> <br />• During earthfill operations field verify lines, grades, and dimensions using hand-held <br />levels and inclinometers, range poles and measuring tapes. <br /> <br />• Coordinate with the Earthwork Contractor and Owner to perform verification surveys at <br />the completion of earthfill operations. Verify corrective action measures as determined <br />by verification surveys. Verification surveys will also be used to determine the limits of <br />earthfills for measurement and payment applications. Submit copy of verification <br />surveys to the Construction Manager. <br /> <br />3.4.4 Clay Liner and Clay Earthfill <br /> <br />• Perform visual and manual soil classifications (ASTM D2488) to verify that material <br />source is suitable for clay liner and clay earthfill. Perform classifications continually <br />during excavation of borrow materials. <br /> <br />• Perform moisture-density relationship testing (ASTM D1557) to determine the <br />maximum dry density and optimum moisture content of clay materials. Perform tests at
The URL can be used to link to this page
Your browser does not support the video tag.