My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 2:28:04 PM
Creation date
3/28/2024 2:04:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0506488
PE
2361 - UST FACILITY
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190A
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4943 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71So- OOLCTPWKEDUftESELOW, <br /> FOR 71 Si-TOOL,SEE PAGE 8 71 S aTQQNLCT <br /> i fOR 77 S41'Q4LCr SEIs;PAGE A <br /> STEP 4G INSERT 71SO-TC"CT OVER INET TUBE <br /> To insWI the 7150-TOOLCT(sold wNrat+ely)over the <br /> inlet q)br,Nst loosen fie thumb screws,so the loud ur) <br /> pass freely over the Inlet tube flange. Align the slot on <br /> the too!with the key on the Inlet tube and insert the <br /> cool down. SM Flquve 9C. TIp to stop dirnen sloe must <br /> be 1-3/16'to 1-114' <br /> Laozen fours 17 G <br /> thumb Hand tighten fTF-P 12C: DFULL HOLES <br /> screws Taal Slot thumb screws With the inlettube and 715aTOGLCT in ptace,carefully <br /> - ddH a 3/16'diameter hole in the upper txrbe using the <br /> -.' --" hole In t"71 SO-TOO-CT as a guide_ The driN stop is <br /> r. <br /> pcnivaned So it v,W borrow,asst against the t oot after <br /> �" � ; ttp bit Inas drilled through t?te upper drop tube. If the <br /> stop is posmioned wrong entre{no hole wil be drilled, <br /> Z. <br /> or a through home could patenualty be drNled through <br /> � - <br /> the in*tube. If no hole is drilled return to step 11 C <br /> and ched the stop dimension. If a hole is drilled <br /> thruuytr The Inlet tube or'into the suety mole the assem- <br /> bly is not salvageable. Will(2)mare holes in the two <br /> �_...._- Inlet remaining guide ho0es. <br /> i <br /> Tube ! <br /> Key <br /> Figurr9C Figure 70C - <br /> 1, <br /> STIEP 1t1C, TIGRTF,N THE 71SO-TOOLCT <br /> Enwre(hat the too)seats flat against the tap of the inlet �_JJ <br /> tube. To pmyerrt vertical movement of to a tool during <br /> drilling,hand tighten bhe thumb Screws against the up- <br /> per drop tube. See Figure 1 OC. <br /> � I <br /> STEP 7 1C: PREPARE DAILL AND BR <br /> Confirm that the stop on the 3/16'drill pit supplied Fryum r?C <br /> vArNthe 7150-TOULCi Is in 1hecorre[t position before <br /> drilting. The stop Is factory r„stalled al a distance be- <br /> tween 1.3/16'to 1-1/4'trom the tip watt+the 71 SO- <br /> TOOLCT. If the stop is not at the correct position a must <br /> be fixed before drilling. <br /> CAUT10N:1tthe drill stop is not in tiw proper loco- <br /> tic n twilure of a premure deny leak test may result. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.