Laserfiche WebLink
Project No. 10-1768 AdvancedGeo <br /> An Employee-Owned Company <br /> Page 11 of 19 <br /> 4.10. CONFORMANCE WITH LOCAL REQUIREMENTS - 40 CFR 112.70) <br /> All applicable ASTs at this Facility are registered with the Local Applicable Requirements <br /> (LEA) and have current certificates of registration and special use permits required by the <br /> local fire code. <br /> 4.11. QUALIFIED OIL-FILLED OPERATIONAL EQUIPMENT - 40 CFR 112.7(k) <br /> There are no oil-filled operational equipment used at the Facility, therefore this section <br /> does not apply. <br /> 5.0. DISCHARGE PREVENTION — SPCC PROVISIONS FOR THE FACILITY <br /> The following measures are implemented to prevent oil discharges during the handling, <br /> use or transfer of oil products at the Facility. Oil-handling employees have received <br /> training in the proper implementation of these measures. <br /> 5.1. FACILITY DRAINAGE - 40 CFR 112.8(b) <br /> The berm is drained under direct supervision of Facility personnel. The accumulated <br /> water is observed for signs of oil prior to draining. The gate valves are normally kept in a <br /> closed position and locked except when draining the berm. Berm drainage events are <br /> recorded on the form included in Appendix G of this SPCCP. <br /> The content of the berm is inspected by Facility personnel during routine visual <br /> inspections, with any spills being immediately reported to the Primary or Secondary <br /> Emergency Coordinator. Routine visual inspections are conducted to inspect the berm <br /> for any sign of deterioration. If any signs of deterioration are found, these observations <br /> are reported to the Emergency Coordinator or Designated Facility Employee and repairs <br /> are conducted immediately. <br /> Any potential discharge from the fueling area ASTs will be restrained by the secondary <br /> containment structures. Discharges from the tire shop area and small discharges <br /> occurring during unloading operations will be minimally restrained by spill containment <br /> equipment in vicinity of the spill. The Facility includes secondary containment berms and <br /> an oil/water separator which are used as containment for spill sources at the Facility. <br /> The retention basin will only contain stormwater run-off. Discharges not immediately <br /> contained with spill absorbents will be directed by drain inlets to the oil water separator. <br /> Discharges, such as those occurring in the maintenance building (while loading waste oil) <br /> will be contained within the building where clean up measures will be conducted. <br />