My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 8:31:35 AM
Creation date
5/14/2024 10:57:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 [REV] APPENDICES W/FIRE PERMIT
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Compost Facility Stormwater Improvements 02300 4 EARTHWORK <br /> A. The EARTHWORK CONTRACTOR shall be solely responsible for making all <br />excavations in a safe manner. Provide appropriate measures to retain excavation <br />sideslopes and prevent rock falls to ensure that persons working in or near the <br />excavation are protected. <br /> <br />1.9 CODES, ORDINANCES, AND STATUTES <br /> <br /> A. The EARTHWORK CONTRACTOR shall be familiar with, and comply with, all <br />applicable codes, ordinances, statutes, and bear sole responsibility for the <br />penalties imposed for noncompliance. <br /> <br />1.10 TOLERANCES <br /> <br /> A. All material limits shall be constructed within the tolerances specified in Section <br />01410, SURVEYS. Minimum thicknesses and slopes shall be as shown on the <br />Construction Drawings. All grading shall be performed to maintain slopes and <br />drainage as shown. No reverse slopes will be permitted. <br /> <br />PART 2 PRODUCTS <br /> <br />2.1 GENERAL <br /> <br /> A. Provide all labor, materials, and equipment necessary to accomplish the Work <br />specified in this section. <br /> <br />2.2 GENERAL EARTHFILL <br /> <br /> A. General Earthfill material shall be used where indicated on the Construction <br />Drawings and for the construction of berms and backfill of anchor trenches and to <br />bring subgrade to required grade where no other material is specified. The <br />material shall be obtained from onsite excavations or stockpiles and shall be free <br />from roots, organic matter, trash, debris, rocks or clods larger than 3 inches, and <br />other deleterious materials. General Earthfill from the Eastern or Northern <br />Borrow Areas may be required to provide sufficient material to backfill the <br />existing sedimentation basin. <br /> <br /> B. The top 3-inches of General Earthfill that will be overlain by geosynthetics shall <br />not contain particles greater than 1/2-inch or any materials that may protude from <br />the surface that could puncture the overlying geosynthetics. <br /> <br /> <br />2.3 GRANULAR DRAINAGE MATERIAL <br /> <br /> A. Granular Drainage Material (GDM): Clean, washed, well-rounded, hard, durable <br />sandy gravel free from foreign materials. Material shall have a maximum particle <br />size of 3/8 inch and shall have less than 3 percent passing the No. 200 sieve. <br /> <br /> B. GDM shall contain no limestone or other material that will adversely react with <br />leachate.
The URL can be used to link to this page
Your browser does not support the video tag.