My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
400
>
2800 - Aboveground Petroleum Storage Program
>
PR0522005
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 8:56:39 AM
Creation date
2/21/2025 4:53:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0522005
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0010965
FACILITY_NAME
KNIFE RIVER
STREET_NUMBER
400
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14712001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
400 S LINCOLN ST STOCKTON 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.0 Personnel Training and Spill Prevention Procedures — 40 <br />CFR 112.7(f) <br />All new employees receive training regarding this SPCC plan and procedures for preventing and <br />responding to fuel spills during their initial employment orientation. All employees receive <br />refresher training regarding the SPCC plan during annual hazmat awareness refresher training. <br />Training includes a review of the Emergency Action Plan including spill/ release response and <br />procedures for reporting any spillage or leakage. KNIFE RIVER CORPORATION personnel <br />also receive instruction on inspection of oil storage tank systems <br />The designated spill prevention person or his designee is responsible for the following: <br />• Instructing facility workers in the operation of equipment in such a manner as to prevent <br />the occurrence of a fuel spill; <br />• Informing facility workers of the applicable pollution laws, rules, and regulations affecting <br />the facility; <br />• Maintaining equipment necessary to prevent spills; <br />• Observing, on a regular basis, loading and unloading operations, to determine that the <br />proper operating procedures are being followed and to afford an opportunity to inspect <br />equipment under operating conditions; <br />• Ensuring that the facility is in compliance with the SPCC plan; <br />• Holding spill prevention briefings with facility personnel, with attention given to reviewing <br />the SPCC plan; <br />• Signing and maintaining records of inspections and spills in accordance with this SPCC <br />plan and maintaining records for a minimum period of three years; <br />• Maintaining a complete copy of this SPCC plan at the facility at all times. <br />SPCC 267-KRC-AMADOR TRANSIT MIX 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.