My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
4035
>
2800 - Aboveground Petroleum Storage Program
>
PR0522162
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 2:00:05 PM
Creation date
5/21/2025 11:31:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0522162
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0010104
FACILITY_NAME
A&A CONCRETE SUPPLY INC
STREET_NUMBER
4035
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17907012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4035 E MARIPOSA RD STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />3032 Marbury Court Fairfield California 94533 Phone 707-365-7440 <br /> <br /> <br />that the vent lids, dip sticks, and liquid sensing device on the waste oil tank, are all working and within <br />calibrated parameters. <br /> <br /> <br /> <br />These three tanks were also found to be fit for continued service from their annual inspection. <br /> <br />The annual inspections for all tanks will continued to be performed on an annual basis each January. The <br />plant is required to update or review the SPCCP within 5 years. The Regional Manager, who is in <br />responsible charge of the facility spill management review and response, has certified that the Plan will be <br />reviewed at least once every five years on page 2 of the SPCCP. Any changes or amendments to the Plan <br />will be done in accordance with review and amendment requirements on page 3 of the SPCCP. <br /> <br />Thank you for the review and comment process that ensured a comprehensive SPCCP for the facility. <br />Please give me a call at 707-365-7440 if you have any further questions. <br /> <br />Sincerely, <br /> <br />Mathew R. Tuggle, P.E. <br />C 61328 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.