My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:57:46 PM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosynte& <br /> consultants <br /> 4. ANALYTICAL METHODS <br /> The laboratory and its staff have the responsibility to process all samples submitted <br /> according to the specific protocols for sample custody, holding times, analysis, and <br /> associated laboratory QA as described in this QAPP. Designated laboratory personnel <br /> will maintain contact with the Project QA Manager to assure that laboratory data quality <br /> indicators (DQIs) are achieved. Laboratory DQIs are defined in terms of accuracy and <br /> precision. <br /> A performance-based analytical program is recommended for the analysis of target <br /> analytes. This recommendation is based on the assumption that the analytical results <br /> produced by different laboratories and/or different methods will be comparable if <br /> appropriate QC procedures are implemented within each laboratory. Table E-2 <br /> summarizes the analytical methods, analytes, method detection limits, and reporting <br /> limits for sample testing, as well as project screening levels for comparison to assess the <br /> appropriateness of the method sensitivity for project goals. <br /> Quality Assurance Project Plan 7 30 April 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.