My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1744
>
2900 - Site Mitigation Program
>
PR0542458
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2026 12:59:37 PM
Creation date
1/26/2026 12:56:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542458
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024399
FACILITY_NAME
PARKWOODS CLEANERS
STREET_NUMBER
1744
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1744 W HAMMER LN STOCKTON 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. CORRECTIVE ACION <br /> This section identifies the corrective actions necessary to address field and laboratory <br /> data validation/verification problems. In general, corrective actions will be initiated <br /> whenever method performance criteria suggest that QA/QC specifications have not <br /> been met. Corrective actions will begin with identifying the source of the problem. <br /> Potential problem sources include failure to adhere to method procedures, improper data <br /> reduction, equipment malfunctions, or systemic contamination. The first level of <br /> responsibility for identifying problems and initiating corrective action lies with the <br /> analyst/field personnel. The second level of responsibility lies with the individual <br /> assigned to reviewing the data. Corrective actions may include more intensive staff <br /> training, equipment repair combined with an enhanced preventative maintenance <br /> program (if appropriate), or removal of the source of systemic contamination. The <br /> corrective and/or preventive actions, if any, will be fully documented in the interim and <br /> final reports. If QA/QC specifications were not met, the samples in question may need <br /> to be recollected and/or re-analyzed. <br /> 8.1 Field Corrective Action <br /> Problems that require corrective action may be encountered in the field. Any finding <br /> that requires corrective action must be documented to the Program Managers. The QA <br /> Manager will confirm that corrective and/or preventive actions have been implemented <br /> and that the problem has been resolved. If more easily addressed problems are <br /> encountered in the field, such problems will be addressed, and the corrective action <br /> noted in the appropriate field memoranda. If an error is made on an accountable <br /> document assigned to one individual, that individual will make all corrections by <br /> crossing a line through the error, entering the correct information, and initialing and <br /> dating the correction. The erroneous information will not be obliterated. The person <br /> who made the entry will correct any subsequent error discovered on an accountable <br /> document. <br /> 8.2 Laboratory Corrective Action <br /> The laboratory will notify the QA Manager if a transportation problem (e.g., <br /> compromised sample containers or nonconforming temperature blanks) has occurred. <br /> The laboratory QA/QC manager, in consultation with the QA Manager, is responsible <br /> for implementing corrective actions in the laboratory (from sample receipt to final data <br /> deliverable). It is their combined responsibility to see that analytical procedures are <br /> followed as specified, and that data generated meet the acceptance criteria. <br /> Appendix C 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.