My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1744
>
2900 - Site Mitigation Program
>
PR0542458
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2026 12:59:37 PM
Creation date
1/26/2026 12:56:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542458
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024399
FACILITY_NAME
PARKWOODS CLEANERS
STREET_NUMBER
1744
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1744 W HAMMER LN STOCKTON 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. SOIL BORINGS AND GROUNDWATER SAMPLING <br /> 2.1 Overview <br /> The soil boring and groundwater sampling SOP was prepared to direct field personnel in <br /> the methods for recording soil boring observations, collecting subsurface soil samples, <br /> and collecting grab groundwater samples during Site investigations. The SOP conforms <br /> to the California Department of Water Resources (DWR) Water Well Standards Bulletin <br /> Numbers 74-81 and 74-90 (DWR, 1990), United States Environmental Protection <br /> Agency (USEPA) Groundwater Sampling and Monitoring with Direct Push <br /> Technologies (USEPA, 2005) and other pertinent technical publications. The soil boring <br /> log and the groundwater sampling forms to be used during Site investigations are <br /> provided in Attachment 1. <br /> 2.2 Equipment <br /> • PPE and air monitoring equipment as required by HASP; <br /> • Direct push sampling equipment and hand auger(provided by driller); <br /> • Plastic sheeting; <br /> • Soil jars and aluminum foil, and/or re-sealable plastic bags; <br /> • Measuring tape or folding ruler at least five feet in length; <br /> • Photoionization or flame-ionization detector(PID and FID, respectively); <br /> • PID or FID calibration kit; <br /> • Disposable bailers and nylon string; <br /> • 5-gallon buckets; <br /> • Water level meter; <br /> • Multi-parameter water quality meter; <br /> • Multi-parameter water quality meter calibration kit; <br /> • Appropriate laboratory provided sample containers; and <br /> • Coolers with ice. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.