My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1877
>
2200 - Hazardous Waste Program
>
PR0528710
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2026 3:43:10 PM
Creation date
1/28/2026 2:47:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0528710
PE
2220 - SM HW GEN <5 TONS/YR
FACILITY_ID
FA0018144
FACILITY_NAME
CINTAS
STREET_NUMBER
1877
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
Stockton
Zip
95206
APN
17733027
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
1877 Industrial DR Stockton 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Floor Pits <br /> The volume witWn the wastewater pits is controlled by level controls. A veal for the <br /> effluent piping is located in the clean floor pit but the water stays well below the piping. <br /> Some possible release scenarios include: <br /> r Floor pit overflow <br /> Wastewater Treatment Room <br /> Wastewater coagulant is purchased in totes and transferred to a tank inside the WWI' <br /> room. Flocculan1, Benlonite Clay and Sodium Percarbonate are purchased as dry powder <br /> and kept in bags. Make-up tanks equipped with mixers are used to prepare dilute <br /> solutions of bentonite clay, flocculant and sodium percarbonate. The BC 1031 and <br /> IM3M drums are stored on secondary containment inside the WWT room. <br /> Possible release scenarios include: <br /> a A hose coupling failure or leak from the hose after the tank filling operation is <br /> complete <br /> • Bulk storage tank overflow inside the WVVT room. <br /> * Make-up tank overflow during the tank filling operation <br /> • Container damage during offloading internal transport or caused by forklift impact <br /> + Sludge tank overflow <br /> • EQ tank overflow of untreated wastewater <br /> ■ Piping or pump failure resulting in a release ofuntrcated or partially lreated <br /> wastewater <br /> A Cintas Pwrier must be present during the entire duration cif the make-up tank filling <br /> process. At no point should the operation be unattended. <br /> Boiler Room <br /> i <br /> Water softener regeneration waste and boiler blowdo n are the two main periodic waste <br /> streams in the boiler room. Boiler water conditioning chemicals arc stored in this room <br /> and are periodically used in small amounts. The ch=icals are stored in 55 Gallon drums <br /> on top of spill containment. A relatively smalI spill or leak involving those chemicals is <br /> possible. <br /> All discharges from the boiler room area drain into floor drains connected to the mein <br /> floor pits and are therefore mixed with other wastewater and treated prior to discharge <br /> into the city sewer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.