Laserfiche WebLink
S A N J O A Q U I N Environmental Health Department <br /> COUNTY <br /> �8. The handwashing and food preparation sinks shall be separated from the warewashing <br /> sink or food preparation / storage areas by a metal splash guard, if separation is less than <br /> twenty-four (24) inches. Splash guard shall be at least six (6) inches in height from back <br /> edge to front edge (CRFC §113953). <br /> ✓9. Floors shall be constructed of approved materials and shall be impervious, smooth, easily <br /> cleanable, and provide employee safety from slipping. The floor/wa[I juncture shall be <br /> coved with a minimum 3/8 inch radius and the floor surface shall extend up the wall at <br /> least four inches. (Vinyl rubber top-set base is not acceptable material). Equipment shall <br /> be sealed to the floor or raised 6 inches off the floor by means of easily cleanable legs or <br /> feet. (CRFC Section 114301). <br /> ✓10.Mechanical exhaust ventilation equipment shall be provided over all cooking equipment <br /> as required to effectively remove cooking odors, smoke, steam, grease, heat, and vapors. <br /> All mechanical exhaust ventilation equipment shall be installed and maintained in <br /> accordance with the California Mechanical Code. Makeup air shall be provided the rate <br /> of that exhausted (CRFC §114149,1). <br /> 1.Provide a warewashing sink with at least three compartments with two integral metal <br /> drainboards. The dimensions of each compartment of the warewashing sink shall be at <br /> least 12 inches wide, 12 inches long, and 10 inches deep, or large enough to <br /> accommodate the cleaning of the largest utensil. Each drainboard shall be at least the <br /> size of one of the sink compartments. The drainboards shall be installed with at least one- <br /> eighth inch per foot slope toward the sink compartment and fabricated with a minimum of <br /> one-half inch lip or rim to prevent the draining liquid from spilling onto the floor. (CRFC <br /> Section 114313). <br /> V 12.Provide a water heater with a minimum capacity of four gallons (CRFC Section 114325). <br /> v1I Obtain a commissary agreement from an approved commissary facility (CRFC Section <br /> 114295). <br /> The EHD must be kept informed of the construction progress. A final inspection must be performed, <br /> operating permit fees paid, and approval to operate granted prior to opening for business. All <br /> equipment must be installed and thoroughly cleaned prior to the final inspection. inspections must be <br /> scheduled at least 48 hours in advance. Charges for additional inspections, re-inspections and/or <br /> consultations may be assessed at the EHD hourly rate of $162 per hour. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with <br /> applicable State laws, and/or city or county ordinance codes, shall be constructed or reconstructed <br /> 2 of 3 <br />