My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601438_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
4103
>
2600 - Land Use Program
>
SU-2601438_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 8:55:09 AM
Creation date
8/5/2026 8:33:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU-2601438
PE
2602 - SOIL SUITABILITY AND NITRATE LOADING STUDY REVIEW
STREET_NUMBER
4103
Direction
N
STREET_NAME
ZUCKERMAN
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
12908054
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
4103 N ZUCKERMAN RD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fco . ANUAO PURAMAXO PACKAGE TREATMENT PLANT: <br /> DESIGN AND OPERATIONAL PARAMETERS <br /> mbined effluent from Lift Stations#1, #2, #3 and#4 will be pumped to the 1Ok gallon <br /> pretreatment settling/flow equalization tank for particulate settling and additional denitrification, as <br /> illustrated on the attached Schematic Design plans. Effluent from this tank will be pumped to the <br /> PuraMax® Moving Bed Biological Reactor(MBBR). The Engineering and Technical Specifications <br /> for the MBBR are found in Appendix J. <br /> In addition, an AiraCarbTM Odor Control System is to be installed per Anua's specifications to <br /> control odors from the MBBR. <br /> VII. FILTER BED DESIGN AND OPERATIONAL PARAMETERS <br /> The treated effluent from the Package Treatment Plant will be pressurized for disposal by a duplex <br /> high-head pump and control/alarm system that will alternate between pumps and supply the new <br /> 5,200 ft' filter bed with equally distributed effluent, as illustrated on the Design Plans. <br /> The manifold and eight laterals will be center-feed to compensate for the 100-ft lateral length. <br /> Perforated 1.5" diameter laterals with 1/8" diameter orifices every 3' from the manifold will be <br /> installed within the 3" perforated pipe inside the 18" diameter Infiltrator® EZFIow®modules. The <br /> modules will be installed side-by-side and secured together with strapping, as illustrated in the <br /> Design Plans. <br /> The filter bed size of 5,200 ft' was determined by the following calculations: <br /> Calculated Tack Capacity(CTC): <br /> 1,125 gallons + (7,493 gpd ADF x 0.75) = 6,745 gallons CTC. 10k gallon flow eq. tank specified. <br /> Leachline (LL) Requirement= 1,200 gal. Base Tank Capacity(BTC) +7,493 gpd ADF = <br /> 8,693 x 0.2 (Sand LL Soil Factor) =1,739. 1,739 x 3 (Sand FB Soil Factor) = 5,216 ftz. <br /> Install 52'N-S x 100' E-W= 5,200 ftz Filter Bed. <br /> At the terminal ends of each lateral, and the manifold, sweep clean-out valves are to be installed. <br /> Clean-out procedures are discussed in Section IX. <br /> Taking the application rate of 0.467 gallons/ft z/day based on a perc rate of 35.7 min/inch, a filter <br /> bed size of 5,200 ftz x 0.467 gallons/ftz/day=2,428 gallons/day the filter bed can theoretically <br /> accept and manage. This ADF volume can be considered more realistic than the complete full- <br /> occupancy total of 7,493 gpd as calculated above. A water meter will be placed on the domestic <br /> water service line of the new well to measure domestic water consumption. <br /> Two Observation/Monitoring Tubes will be installed in the filter bed at locations illustrated on the <br /> Design Plans. One observation tube is to be installed near the NWC of the filter bed and the <br /> second observation tube to be installed in the SEC. <br /> Separation distance between soil-effluent interface and depth to groundwater= <br /> 7.3 ft depth to groundwater- (1 ft soil cover+ 1.5 ft EZFIow module dia.) =4.8 ft. <br /> Page -6- <br /> Chesney Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.