Laserfiche WebLink
frHolding tank discharge details are unknown at this time since it is unknown how many vessels will <br /> e advantage of this service; therefore, the required pump-out event at 50% of total tank capacity <br /> l be dependant upon the alarm system, or direct observation upon tank lid removal. The Site Plan <br /> Appendix B illustrates all proposed improvements on the property. <br /> Section 10.9: The CGS owner will submit a copy of the service agreement with a licensed septage <br /> pumping firm. <br /> Section 10.10: Operational records, such as pump-out events will be maintained by the CGS owner <br /> and presented to EHD in the annual operating permit. <br /> Section 10.11: The CGS owner will obtain an annual operating permit from EHD. <br /> IX. OPERATIONS AND MAINTENANCE PLAN <br /> Operations will include those previously referenced, primarily gravity flow of influent from each <br /> individual source, force main pressure of effluent to individual Lift Stations, and ultimately to the <br /> Package Treatment Plant. Maintenance will generally consist of periodic cleaning based on direct <br /> observations of pump screens, filter media and purging filter bed laterals of biomat buildup. <br /> Control panels should be inspected and tested monthly to ensure proper audio and visual alarm <br /> operation. <br /> The following maintenance procedures are to be performed monthly/yearly, or a different time <br /> interval if determined by a Qualified Professional after the first inspection. <br /> 1. Observe a representative sample of septic tanks to check for solids buildup. <br /> 2. Check Lift Station duplex pumps and visual/audible alarm systems monthly. <br /> 3. Check grease interceptor tank and effluent filter for excessive grease content and potential pump- <br /> out intervals. <br /> 4. Check filter bed observation/monitoring tubes for standing effluent. <br /> 5. Check the Septic Tank Monitoring Systems on the west side of the Camp Gold Star facility <br /> for standing effluent within the 8" monitoring tube. <br /> 6. Check visual/audible alarm for the holding tank on a monthly basis and ensure no leakage of <br /> influent around the holding tank entry point or from pump out procedures. <br /> 7. Terminal ends of each lateral must be flushed out every two years or sooner if significant biomat <br /> buildup is observed during the first clean out. The effluent from this flushing must be captured <br /> in a container such as a bucket and the contents poured into the CGS holding tank. <br /> Signs should be placed in each Bathroom/Restroom signifying that CGS is on a septic system and <br /> nothing but human waste and biodegradable toilet paper(e.g., Scotts®Rapid-Dissolving Toilet <br /> Paper) are to be flushed down the toilets. <br /> The EHD requires an annual operating permit and potentially a biannual or annual inspection report <br /> on the Package Treatment Plant operation, which includes monitoring, sampling and reporting. <br /> Sampling and testing typically includes analysis of the pretreatment tank contents and the treated <br /> PTP effluent prior to filter bed disposal. <br /> Page -8- <br /> Chesney Engineering, Inc. <br />