Laserfiche WebLink
SERVICE DISCONNECT AND <br />METER BASE BY CONTRACTOR <br />PER PG&E REQUIREMENTS....._ <br />A <br />5­ 1 <br />F3>- <br />10 <br />PANEL "A' PART OF MINI <br />UNIT SUBSTATION. SEE <br />g SCHEDULE. MAINTAIN <br />i N.E.C. REQUIRED CLEARANCE <br />FOR ALL ELECTRICAL <br />EQUIPMENT. <br />ii <br />1 <br />1 <br />PAD MOUNTED TRANSFORMER. TRANSFORMER BY <br />PG&E. TRANSFORMER PAD BY CONTRACTOR PER <br />{' PG&E REQUIREMENTS. <br />JE <br />T <br />3 _ <br />/ E <br />l� 1,3 <br />I F2 <br />1 <br />5'X12'X18" THICK CONCRETE GENERATOR EQUIPMENT <br />PAD FOR 125KW 277/480V, THREE PHASE, FOUR WIRE <br />DIESEL ENGINE DRIVEN GENERATOR WITH 50 GALLON <br />SKID MOUNTED DOUBLE WALL FUEL TANK WITH ZONE 3 <br />SEISMIC TIE DOWNS PROVIDED BY CONTRACTOR. (TO BE <br />APPROVED BY COUNTY ENGINEERING PRIOR TO <br />INSTALLATION). <br />E <br />/ <br />/ NEW UNDERGROUND SECONDARY <br />/ SERVICE. SEE ONE -LINE DIAGRAM. <br />/ f <br />4' THREE LAMP HEAVY-DUTY TURRET <br />INDUSTRIAL FIXTURE WITH ELECTRONIC <br />CAA <br />BALLAST AND T8 LAMPS. LITHONIA <br />CAT. NO. AF348120 OR EQUAL WITH <br />WIRE GUARD. (TYP. OF 2). CHAIN <br />HUNG. COORD. EXACT LOCATIONS WITH <br />MECHANICAL EQUIPMENT. <br />2 <br />1 3/4" CONDUIT WITH 5 #12. <br />'A <br />4 <br />(8) <br />WP <br />WP <br />3/4" CONDUIT WITH 3#12. <br />DOOR SWITCH: RATED <br />AT 1OA/125V MIN. <br />SWITCH TO CLOSE WHEN <br />DOOR IS OPENED. <br />PS-11 <br />20A/125V <br />WALL SWITCH <br />NOTE: <br />CONNECT FAN SO FAN WILL RUN WHENEVER DOOR IS OPEN, <br />AND PROVIDE MANUAL WALL SWITCH OVERRIDE. <br />EXHAUST FAN CONTROL SCHEMATIC <br />OT TO SCALE <br />�I <br />r <br />COMPUTED: A. BROTHERS <br />DRAWN BY: A. BROTHERS <br />DESIGN BY: A. BROTHERS <br />PROD. ENGR, <br />NEW UNDERGROUND SECONDARY <br />SERVICE. SEE ONE -LINE DIAGRAM. <br />1 <br />s _ <br />KEYED NOTES (THIS SHEET ONLY) <br />1� CHLORINE METERING PUMP, LMI OR EQUAL: 1 H.P. 16.0 F.L.A. 0 120V SING <br />INTERLOCK WITH WELL PUMP. SEE WELL PUMP CONTROL SCHEMATIC SHEET <br />AIR COMPRESSOR: 1 H.P. 16.0 F.L.A. ® 120V SINGLE PHASE. <br />3� EXHAUST FAN: 1/3 H.P. 7.2 F.L.A. ® 120V SINGLE PHASE. SEE CONTROL <br />SCHEMATIC THIS SHEET. <br />WELL PUMP: 75 H.P. 96.0 F.L.A. ® 480V THREE PHASE. <br />D <br />SUBMERSIBLE STORM WATER PUMP: 25 H.P. 34.0 F.L.A. 9 480V THREE PHASE. <br />(TYPICAL OF TWO). <br />® DOOR SWITCH FOR CONTROL OF EXHAUST FAN. SEE CONTROL SCHEMATIC <br />THIS SHEET. <br />7� FUSED SWITCH COMBINATION SIZE ONE STARTER IN NEMA 1 ENCLOSURE FUSED A' <br />20A GLASS RK-1. <br />3/4" CONDUIT WITH 2 #10 AND 1 #10 GROUND. <br />FUSED SWITCH COMBINATION SIZE FOUR SOLID STATE ELECTRONIC REDUCED <br />VOLTAGE STARTER FUSED AT 125A CLASS RK-1 IN NEMA 1 ENCLOSURE. <br />11 10 EXTERIOR AREA LIGHT: KENNELL CAT. NO. 21-60-50-HPF OR APPROVED EQUAL. <br />DO <br />FIXTURE SHALL BE CONTROLLED FROM ROOF MOUNTED PHOTO CELL FACING <br />NORTH. PHOTO CELL, FIXTURE AND RELATED WIRING PROVIDED BY CONTRACTOR. <br />ELECTRICAL SITE <br />SCALE: 1/8" = l'-O" <br />PLAN <br />GRAPHIC SCALE <br />4' 0' 4' 8' 16' <br />SCALE: 1 /8"=1'-0" <br />CELLA BARR ASSOCIATES <br />7/7 CAMPUS COMMONS RD, STE 200 <br />SA(_RAME1� -ll -), `:-`A�--I F ORNI A 95825 <br />05L *A <br />STORM DRAIN POND <br />gTnPKA wnTFR n P-rTDTrei EQUIPMENT <br />J SHEET E2. <br />3 Phase 4 Wire <br />Voltage LLi 208 Voltage LG= 120 <br />❑C Devl CKT, BKR, <br />Device Family, BOLT ON <br />Mounting= SURFACE <br />Enclosure; NEMA <br />1 <br />Comments= 60A M.C.B. <br />Bus <br />Ratingi <br />100 <br />Available Fault <br />Dutyi 1411 A <br />3 Phase <br />Ckt Description/ <br />*Load Criteria* Total Remarks <br />Device <br />P <br />Device <br />Remarks <br />Total <br />xLoad Criterlaw Description/ <br />Ckt <br />No Location <br />Type <br />Ea Qty Dem VA <br />Amps P <br />H <br />Amps P <br />VA <br />Type Ea Qty Dem Location <br />No <br />1 <br />LIGHTS <br />1 <br />255 <br />20 <br />1 <br />A <br />301 <br />1920 <br />10 <br />CHLORINE PUMP <br />2 <br />3 <br />RECEPTACLES <br />3 <br />360 <br />20 <br />1 <br />B <br />30 <br />1 <br />1920 <br />9 <br />COMPRESSOR <br />4 <br />5 <br />EXHAUST FAN <br />9 <br />864 <br />EO <br />1 <br />C <br />20 <br />1 <br />100 <br />4 <br />LC-1 <br />6 <br />7 <br />SPARE <br />20 <br />l <br />A <br />20 <br />1 <br />SPARE <br />8 <br />9 <br />SPACE <br />B <br />SPACE <br />10 <br />11 <br />SPACE <br />C <br />SPACE <br />12 <br />ENDUSE LOADS: PHASE A <br />VA <br />2175, PHASE B VA 2280. <br />PHASE C VA <br />964. <br />TOTAL L❑ADSi CONNECTED KVA <br />5.4 DEMAND KVA 5.4 DESIGN <br />KVA <br />5.9 <br />CONNECTED FLA <br />15.0 DEMAND FLA 15.0 DESIGN <br />FLA <br />16.5 <br />NOTE: PANEL "A" IS AN INTEGRAL PART OF A MINI UNIT SUBSTATION. REFER TO ONE -LINE DIAGRAM. <br />GENERAL ELECTRICAL NOTES <br />1. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ELECTRICAL INSTALLATIONS WITH ALL OTHER <br />TRADES TO AVOID ANY CONFLICTS WITH PIPING, STRUCTURE, ETC. <br />2. ALL NEW WIRING SHALL BE INSTALLED IN CONDUIT WITHOUT EXCEPTION, MINIMUM SIZE CONDUIT SHALL BE 3/4" EMT. <br />3_ ALL NEW CONDUCTORS SHALL BE TYPE THWN/THHN 90°C COPPER, <br />4. THE USE OF NO. 14 AWG COPPER CONDUCTORS SHALL BE RESTRICTED TO CONTROL AND INSTRUMENT WIRING. <br />5. ALL ELECTRICAL EQUIPMENT SHALL BE GROUNDED IN ACCORDANCE WITH ARTICLE 250 OF THE N.E,C. <br />6. ALL CUTTING AND PATCHING REQUIRED FOR THE INSTALLATION OF NEW RACEWAYS OR EQUIPMENT SHALL BE PERFORMED BY A <br />TRADESMAN EXPERIENCED IN THE WORK REQUIRED. ALL FINISHES SHALL MATCH EXISTING ADJACENT SURFACES. <br />7. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY LOSS OR DAMAGE CAUSED BY HIM OR HIS WORKMAN TO THE <br />FACILITY DURING THE COURSE OF CONSTRUCTION. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR <br />REPLACING SUCH LOSS OR DAMAGE AT NO ADDITIONAL COST TO THE OWNER. <br />8. ALL ELECTRICAL EQUIPMENT INSTALLED ON THE ROOF OR OUTSIDE OF THE BUILDING SHALL BE NEMA 3R RATED, <br />9. THE ELECTRICAL WORK SHALL COMPLY WITH ALL APPLICABLE CITY, COUNTY, STATE AND SERVING ELECTRICAL UTILITY CODES, <br />ORDINANCES, RULES AND REGULATIONS. THE ENTIRE ELECTRICAL INSTALLATION SHALL COMPLY WITH OR SURPASS THE LATEST <br />EDITION OF THE NATIONAL ELECTRICAL CODE. <br />10. THE ELECTRICAL CONTRACTOR SHALL FURNISH ALL MATERIALS, TOOLS, LABOR, PLAN CHECK FEES, ETC., FOR A COMPLETE <br />ELECTRICAL INSTALLATION UNLESS OTHERWISE NOTED ON PLANS. <br />11. ALL MATERIALS FURNISHED BY THE ELECTRICAL CONTRACTOR SHALL BE NEW AND OF FIRST CLASS QUALITY, SHALL BE U.L. <br />LISTED AND FREE OF ANY DEFECTS UNLESS OTHERWISE NOTED ON PLANS. <br />12. ALL EQUIPMENT SHALL BE RATED FOR USE INTENDED - VOLTAGE, H.P., ETC. ALL DISCONNECT SWITCHES FURNISHED SHALL BE <br />LOAD BREAK RATED. <br />13. ALL NECESSARY PERMITS REQUIRED FOR ELECTRICAL INSTALLATIONS ARE THE RESPONSIBILITY OF THE ELECTRICAL <br />CONTRACTOR AND SHALL BE CONSIDERED TO BE PART OF HIS CONTRACT FEE. <br />14. THE ELECTRICAL CONTRACTOR SHALL FULLY GUARANTEE HIS INSTALLATION FOR A PERIOD OF ONE YEAR FROM THE DATE OF <br />FINAL ACCEPTANCE BY THE OWNER AGAINST IMPERFECT WORKMANSHIP AND MALFUNCTION OF EQUIPMENT. ANY WORK FOUND TO <br />BE DEFECTIVE WITHIN THIS PERIOD SHALL BE REPAIRED OR REPLACED PROMPTLY AT NO ADDITIONAL COST TO THE OWNER. <br />15. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND CANNOT SHOW EVERY CONNECTION, JUNCTION BOX, WIRE, CONDUIT, ETC. THE EXACT <br />LOCATION AND ARRANGEMENT OF ALL PARTS SHALL BE DETERMINED AS THE WORK PROGRESSES. THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR PROVIDING A COMPLETE AND FUNCTIONAL ELECTRICAL SYSTEM. <br />IMPROVEMENT PLANS FOR <br />BLACK OAK ESTATES <br />ELECTRICAL SITE PLAN <br />COUNTY OF SAN JOAQUIN <br />M07 HY <br />SALILES ?ri <br />E 15659 :;u <br />�(',3,\ K&TRICAII/���� <br />El <br />DATE: AUGUST 1999 <br />scALE: AS NOTED 25 <br />HORIZONTAL: oF- <br />VMCAL: <br />CADFILE: L: \53008401 \ELEC\E1 28 <br />CALIFORNIA JOB NO: 5-30084-01-0274 <br />