Laserfiche WebLink
'11 <br />UNDERGROUND PRIMARY BY PG&E <br />10 20OA/3P/600V SERVICE ENTRANCE RATED NEMA 3R <br />PAD MOUNTED <br />TRANSFORMER <br />PROVIDED <br />BY <br />DISCONNECT SWITCH FUSED AT 200A CLASS RK-1. <br />PG&E. TRANSFORMER PAD BY <br />PER PG&E REQUIREMENTS. <br />CONTRACTOR <br />2O 2" CONDUIT WITH 4 #3/0 AND 1 #6 GROUND. <br />200A 7 <br />JAW METER <br />BASE WITH FACTORY <br />O 1-1 /2" CONDUIT WITH 3 #1 /Q AND 1 #6 GROUND. <br />INSTALLED <br />TEST BY-PASS <br />FACILITIES BY <br />OFUSED SWITCH COMBINATION SIZE FOUR SOLID STATE <br />CONTRACTOR PER PG&E <br />REQUIREMENTS. <br />ELECTRONIC REDUCED VOLTAGE STARTER FUSED AT <br />M <br />1 2 <br />125A CLASS RK-1 IN NEMA 1 ENCLOSURE. <br />NEMA 1 <br />WI REWAY <br />5O 15 KVA MINI UNIT SUBSTATION. 480V THREE PHASE <br />} <br />TO 208/120V THREE PHASE, FOUR WIRE. SQ D., <br />© <br />WESTINGHOUSE OR APPROVED EQUAL. <br />#2 <br />0 <br />C <br />3/4" CONDUIT WITH 3 #8 AND 1 #10 GROUND. <br />— <br />o <br />40/3 I A <br />� <br />010OA/3P/600V SERVICE ENTRANCE RATED NEMA 3R <br />3" EMPTY CONDUIT WITH PULL <br />DISCONNECT SWITCH FUSED AT 100A CLASS RK-1. <br />STRING AND TRENCHING AND <br />O <br />BACKFILL BY CONTRACTOR PER <br />75 <br />60/3 <br />F <br />8 1-1/2" CONDUIT WITH 3 #2 AND 1 #8 GROUND. <br />O <br />PG&E REQUIREMENTS. <br />#2 <br />a <br />J a. <br />9O DUPLEX PUMP CONTROL PANEL WITH COVER MOUNTED <br />z <br />DISCONNECT, FUSED PROTECTED SIZE 2 MOTORSTARTERS, <br />BOND TO METAL #2 <br />a <br />COVER MOUNTED H-O-A SELECTOR AND RESET <br />UNDERGROUND o <br />SWITCHES AND INTERNAL 20A/125V G.F.I . DUPLEX <br />WATER PIPE <br />RECEPTACLE. SQ. D CLASS 8940 OR APPROVED EQUAL. <br />3/4" X 10'-0" <br />#2 <br />10 3" CONDUIT WITH (2) 4 CONDUCTOR #6 AWG SUBMERSIBLE <br />COPPER CLAD <br />CABLES. SEAL BOTH ENDS OF CONDUIT WITH SILICONE <br />STEEL GROUND #2 <br />SEALANT. <br />(TYPICAL OF 2F <br />MINIMUM). 6'-0" <br />MIN. <br />11 2" CONDUIT WITH (3) 2 CONDUCTOR #12 AWG SUBMERSIBLE <br />CABLES. SEAL BOTH ENDS OF CONDUIT WITH SILICONE <br />SEALANT. FLOAT SWITCHES SHALL BE PROVIDED BY <br />100A 7 <br />JAW METER <br />BASE WITH FACTORY <br />CONTRACTOR. <br />3" EMPTY CONDUIT WITH PULL <br />STRING AND TRENCHING AND <br />BACKFILL BY CONTRACTOR PER <br />PG&E REQUIREMENTS. <br />BOND TO METAL #6 <br />UNDERGROUND 0 <br />WATER PIPE <br />3/4" X 10'-0" <br />COPPER CLAD #6 <br />STEEL GROUND <br />(TYPICAL OF 2 6'-0" MIN. <br />MINIMUM). <br />REVISION I DATE <br />#6 <br />INSTALLED TEST BY-PASS FACILITIES BY <br />CONTRACTOR PER PG&E REQUIREMENTS. <br />7 <br />n n NEMA 3R WI REWAY <br />#6 <br />#6 <br />n <br />LO <br />DUPLEX PUMP <br />CONTROL PANEL <br />WITH 20A/125V <br />GFI RECEPTACLE <br />10 11 <br />wP A wP <br />ci <br />n� Q <br />0 <br />a <br />a L cn <br />ONE -LINE <br />DIAGRAM <br />NOT TO SCALE <br />NOTE: REFER TO PUMP STATION <br />DETAILS FOR FLOAT SWITCH <br />MOUNTING ELEVATIONS. <br />WELL SITE LOAD CALCULATION <br />LIGHTS AT CONNECTED X 125% = 255VA <br />RECEPTACLES PER N.E.C. 220-13 = 360VA <br />MISCELLANEOUS LOADS AT CONNECTED = 1,000VA <br />MOTORS AND MECHANICAL EQUIPMENT AT CONNECTED = 4,704VA <br />LARGEST MOTOR AT CONNECTED X 125% = 99,766VA <br />TOTAL <br />106,085VA (480V X 1.73) = 127.6A <br />106,085VA <br />STORM WATER LOAD CALCULATION <br />MISCELLANEOUS LOADS AT CONNECTED <br />MOTORS AT CONNECTED <br />LARGEST MOTOR AT CONNECTED X 125% <br />TOTAL <br />DESCRIPTION <br />64,101 VA - (480V X 1.73) = 77.1 A <br />500VA <br />28,267VA <br />= 35, 334VA <br />64,101 VA <br />APPROVED DATE COMPUTED: <br />A. BROTHERS <br />DRAWN BY: A. BROTHERS <br />DESIGN BY: A. BROTHERS <br />PROD. ENGR. <br />GRADE <br />w <br />3 POLE <br />Q 3: <br />FUSED <br />= a <br />SWITCH <br />a_ aL <br />ww <br />w0-1 <br />of <br />=3: <br />�. <br />� w a. <br />�-- <br />O Of a_ <br />��V) <br />CPT <br />PROVIDE SEC. FU. <br />SIZED AT MAX. <br />OF 167% OF CPT <br />SECONDARY <br />OFF <br />HAND F AUTO <br />LVM ' <br />I <br />i <br />— i <br />PROVIDE OVERLOAD HEATERS <br />STARTER SIZED PER ACTUAL MOTOR <br />CONTACTS NAMEPLATE. <br />M 1 OL T, <br />LVM <br />ALINE VOLTAGE <br />MONITOR ALLEN <br />BRADLEY 8135 <br />OR EQUAL. <br />120V PROVIDE PRIMARY FUSES <br />SET TO OPEN AT 60 PSI G <br />AND CLOSE AT 40 PSIG <br />1 PS-2 2 <br />mi <br />M1 <br />OL(3) <br />M <br />0 <br />G <br />7 <br />TO <br />M1 CHLORINATOR <br />8 PUMP CONTROL <br />9 <br />Fo_ <br />M1 SPARE <br />10 r <br />-.,cX2 <br />WELL PUMP MOTOR CONTROL SCHEMATIC <br />NOT TO SCALE <br />ALL EQUIPMENT SHALL <br />DOME FINISH TOP OF CONCRETE <br />POLE FILL (TYPICAL) <br />4" DI A. X 8'--0" SCHED. 40 <br />IRON SUPPORT POST FILLED <br />WITH 3000 P.S.I. CONCRETE. <br />PAINT WITH PRIMER AND 2 <br />COATS INDUSTRIAL ENAMEL <br />(COLOR AS DIRECTED BY OWNER) <br />TYPICAL. <br />3" X 3" X 1 /8" ANGLE IRON <br />WELDED TO SUPPORT POST. <br />(TYPICAL AT 3 PLACES, MIN.) <br />PAINT WITH PRIMER AND 2 <br />COATS INDUSTRIAL ENAMEL <br />(COLOR AS DIRECTED BY OWNER) <br />TYPICAL. <br />8" THICK CONCRETE PAD <br />4" ABOVE GRADE, 4" BELOW <br />GRADE. PAD SHALL EXTEND <br />V-0" BEYOND EACH OUTSIDE <br />POST AND SHALL EXTEND 4'-0" <br />IN FRONT OF EQUIPMENT. <br />STORM WATER EQUIPMENT RACK DETAIL <br />NOT TO SCALE <br />CELLA BARR ASSOCIATES <br />777 CAMPUS COMMONS RD, STE 200 <br />SACR AMEN TO, CAL"[ FORNI A 95825 <br />916) 5565- 7446 FAX (916) 565-7452 <br />INSTRUMENT TABLE <br />DESC:RP'TION <br />MANUFACTURER <br />CATALOG NUL4BER <br />LEVEL <br />CONTROLLER <br />WARRI CK, B&W <br />(1) 1 D1 D1 CONTROLLER <br />NO. 1 (LC-1) <br />OR EQUAL <br />LEVEL <br />SENSOR <br />WARRI CK, B&W <br />() 1 3E2B FITTING <br />NO. 1 (LS-1) <br />OR EQUAL <br />(2) 3R5A1 ELECTRODES <br />PRESSURE <br />N3-DAW-33-7-2 <br />SWITCHES: <br />MERCOI D <br />5---150 PSI OPERATING <br />(PS-1) (PS-2) <br />RANGE <br />TO AIR <br />—_ <br />COMPRESSOR <br />SEE DETAIL #2 THIS <br />SHEET <br />� <br />I <br />I I <br />NEMA 3R LEVEL <br />HD(D <br />' <br />_ CONTROLLER "LC-1" <br />w <br />o <br />O I I <br />ENCLOSURE WALL <br />Z <br />'� <br />MOUNTED NEXT TO <br />Q <br />COMPRESSOR STARTER. <br />D_ U <br />TOP OF TANK <br />50" <br />COMPRESSOR "ON" - <br />6" <br />COMPRESSOR "OFF"A. <br />LEVEL SENSOR (LS-1) <br />�1 /4" BRASS LEVEL <br />ELECTRODES WI TH PVC <br />SHEATH. WARRI CK, <br />B&W, OR EQUAL. (TYP) <br />LEVEL CONTROLLER "LC-1" <br />NOT TO SCALE <br />STARTER <br />CONTACTS <br />Q H �-- <br />t--- <br />Ir J J :D <br />o�a-z� <br />N O D Q N <br />�dcoa-u <br />M1 OL <br />M <br />OFF <br />HAND AUTO <br />OL(1) <br />M1 <br />i <br />i <br />1 PS-1 2 LC-1 3 <br />SET P.S.I.TO OPEN AT <br />100 \11,-N.O. CONTACTS IN LEVEL <br />CONTROLLER "LC-1". SEE <br />DETAIL NO. 1 THIS SHEET. <br />AIR COMPRESSOR CONTROL SCHEMATIC <br />NOT TO SCALE <br />cq <br />Q H �-- <br />Q <br />J <br />>wa_ <br />-J <br />wU <br />p3�:a.Zx <br />N O D <br />Q <br />raV)a_UN� <br />STARTER <br />CONTACTS_ M1 OL <br />OFF <br />HAND j AUTO <br />OL(1) <br />i <br />I <br />1 LC-1 3 <br />0 A <br />N <br />\-N.O. CONTACTS IN LEVEL <br />CONTROLLER "LC-1". SEE <br />DETAIL NO. 1 THIS SHEET. <br />CHLORINATOR PUMP CONTROL SCHEMATIC <br />NOT TO SCALE <br />IMPROVEMENT PLANS FOR <br />BLACK OAK ESTATES <br />ELECTRICAL DETAILS <br />COUNTY OF SAN JOAQUIN <br />DATE: AUGUST 1999 <br />Ste: AS NOTED <br />HORIZONTAL.' <br />VE"CAL: <br />CADFILE: L:\53008401\ELEC\E2 <br />CALIFORNIA, IJOB NO:5-30084-01-0274 <br />E 2 <br />9W <br />V; <br />